Pride Plumbing came out, cut out a section of an asphalt parking lot near the building's foundation, dug down to expose and access the outside main sewer septic drain line, cut into the line, installed a new two-way PVC cleanout with a cap (connecting it to the existing outside main sewer septic drain line with new PVC fittings and Fernco couplings), and covered the hole after installation. We cut the cleanout cap level with grade to minimize it being a tripping hazard and sprayed the asphalt off.