Pride Plumbing came out and provided a cost estimate to: 1) turn the water off to the building; 2) remove two urinals and their flush valves; 3) cut access holes in the wall where the drain pipes came through; 4) remove all PVC and cast iron piping that was going directly to the urinals, replace it with new PVC piping and fittings, and a new drain system for each urinal; 5) hang and install two new urinals and flush valves; 6) test the urinals for leaks and proper operation; and 7) install plastic plumbing panels to cover the holes we cut in the wall.