Pride Plumbing came out and performed the following work: 1) removed two urinals from the wall along with their Sloan flush valves; 2) used a sewer machine down through their drains and cleared any blockages; 3) installed new urinal flange gaskets and mounting bolts; 4) mounted two new Kohler urinals to the wall and installed new Sloan flush valves; and 5) made their drain and water connections and then tested for leaks and proper operation and drainage.