Pride Plumbing came out and performed the following work: 1) cut a hole in the wall to gain access to a clogged drainpipe, cut out a section of the pipe, used a sewer machine and cleared the blockage; reconnected the pipe to the main drain stack using two new Fernco couplings; and 2) replaced two toilets with new Gerber Viper models (this included draining and pulling the old toilets, inspecting and cleaning the flanges, replacing the toilet bowls, toilet tanks, tank to bowl gaskets and bolts, seats, wax ring gaskets, toilet bowl bolts, toilet bowl bolt washers, toilet bowl bolt caps, and above-floor stainless steel braided water supply lines). Once installed, we tested both toilets for leaks and proper operation with no issues.