I found the upstairs 2.5 ton system low on R410a. I offered the customer to fill it up or replace the system. The customer decided to move forward with replacement. The system is scheduled to be installed on July 2nd arrival time of 8:30am to 9:30am. I collected a 6000.00 deposit by check number 1210. I waved the service fee.