Preformed cooling maintenance on one system. Checked start amps and noticed that the amps were reading over 100amps/112amps. We checked all other electrical components. All tested within manufacture specifications. Client did let us know water was coming out of the secondary drain line. We did provide estimate for blowing out main drain line. Client went with clearing main drain line. We provided estimates for a hard start kit and compressor savor bundle. Unit was cooling upon departure.