Perform maintenance on one steam boiler, One hot water boiler, And two Hydro air handlers with one fan driven humidifier: * Replaced and dated April air 210 air filter for first floor Hydro air handler * Replaced humidifier water panel for first floor fan driven humidifier * Replaced start capacitor for gym Hydro air handler * Replaced thermocouples for both steam and hot water boiler Hydro Air handler: * replaced and dated air filters * Open air handler cabinet door * Vacuumed and dusted out cabinet doors and inside of air handlers * Inspected Hydro coils for leaks or corrosion- none * Inspected and tested blower motors, and assemblies- Replaced capacitor for gym zone * inspected ductwork- Extremely dirty recommended ductcleanings for all four systems in house * run and test system operations- confirm hydro coils heating and fan driven aqua-stats are operational Gas boilers: * removed all burners from boilers * Vacuumed and brushed out all burners * Vacuum and dusted out burner