11 Kimball Place
Mount Vernon, NY 10550
914-793-7700

Local Reviews
for tuckahoe, ny

Rated 5.0 out of 5 stars based on 5 customer reviews

Expertise is top notch

On time and very thorough!

  • Overall Experience
  • Quality
  • Price
  • Convenience

Service

Nigel was very diligent and communicated what he did clearly.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Excellent service

Richard with innovative air was great! Very prompt, communicated arrival time and sent updates and was extremely helpful and knowledgeable .

  • Overall Experience
  • Quality
  • Price
  • Convenience

Antonio is the best!!

Innovative and Antonio do not disappoint. Courteous, prompt, thoughtful and thorough. Know the work will get done with care. thank you!!

  • Overall Experience
  • Quality
  • Price
  • Convenience

Great. Very professional

ExceemtVery Everyone y poor

  • Overall Experience
  • Quality
  • Price
  • Convenience

Job Locations
for tuckahoe, ny

Nigel  B.

Nigel B. Job Checkin

Performed heating maintenance on one burnham hot water boiler with indirect domestic hot water tank removed and cleaned the burners and the electronic spark igniter and checked electrical and mechanical components and connections also checked automatic flue damper and checked the expansion tanks also flushed the domestic hot water indirect tank and covered the condensers and turned the power off at the disconnect at the condensers checked boiler and domestic hot water left systems operational View visual findings from this job here - https://visionshare.xoi.io/?id=XA-EE1C-6844012A1CCD4C488E74A1BD4F8E3A75


Mark E.

Mark E. Job Checkin

View visual findings from this job here - https://visionshare.xoi.io/?id=XA-EE1C-3DE5039F900D443897936FB980A12694 Customer has no heating in home from gas water boiler: * call for heating at thermostat at arrival * check boiler in basement * found that the circulator pump is on and running and the vent damper has opened but the igniter is not sparking pilot to light boiler * check safety’s and found system off on spill switch * reset spill switch and boiler fires- normal operations * immediately can feel back drafts from the boiler hood and exhaust spilling into boiler room * shut system down * disconnected flue piping to find chimney 90%+ plugged with debris- appears that the chimney has collapsed * show all findings to customer * reconnect flue piping and shut power and gas to boiler RECOMMENDED - to customer to contact Mr. Chimney to have the chimney inspected and recommended follow up maintenance after it’s repaired to insure normal operations


Nigel  B.

Nigel B. Job Checkin

View visual findings from this job here - https://visionshare.xoi.io/?id=XA-213F-1C340A7B1F534C8082C22D68172D691F


will@innovativeairsolutions.com

will@innovativeairsolutions.com Job Checkin

(1) AC Maintenance - UNICO -Upon arrival client mentioned that she won’t be on site until 9am. Checked condenser pressures checked fuse found fuse blown, supplied and installed 30 amp fuse, checked electrical compartment and cleaned, found pitted contactor and out of range capacitor, Supplied and installed Turbo Capacitor and Contactor at condenser, also installed Hard Start Kit and removed potential relay. Checked indoor unit, flushed drain line, checked evaporator coils ok, filter recently replaced. Started system, checked delta T ok, performed full condenser wash to remove dirt and debris from coils. Unit is now fully operational and cooling well. Reviewed all work completed with client, collected payment, emailed invoice.


will@innovativeairsolutions.com

will@innovativeairsolutions.com Job Checkin

Upon arrival set up Extension Ladder to access UNICO Air Handler, Checked Secondary Pan noticed pan filled with water, Vacuumed all of the water inside of pan, System was off on safety device, cleaned pan switch and tested ok, condensation line was also blocked. Blew out drain line and cleaned dirt out of condensation line, tested primary pan with water multiple times no leakage at this time, added Vent into Condensation line. Checked refrigerant pressures checked coils dirty must return to complete FULL Condenser Cleaning - checked delta T ok receiving good temp split, System is currently cooling and operational at this time. Follow Up Action: Return to Complete FULL Condenser Wash to remove debris and dirt build up and improve system performance. Office will follow up.


julio@innovativeairsolutions.com

julio@innovativeairsolutions.com Job Checkin

Service call for a/c not cooling on arrival the fuse at the condenser was checked and the fuse was ok. The thermostat is calling for cooling but nothing is run air handler is not running and condenser is also not running. The air handler is located downstairs in growlers bar. Two techs and an extension ladder is needed to access the air handler in the ceiling. Access is needed to air handler to further diagnose the issue further. This issue is not related to the fuse burning out. There is no voltage at the thermostat. No one was onsite at the time of the visit.


julio@innovativeairsolutions.com

julio@innovativeairsolutions.com Job Checkin

Service call for no a/c in dance studio 2nd floor suite. On arrival thermostat was set to 67 but reading 83 degrees. Found a bad fuse at the outdoor disconnect for the condenser. This fused was replaced and system started up. Checked refrigerant pressures, total amps and compressor amps. Pressure are good and system is back up and running. It is recommended to replace the fused disconnect to a regular disconnect and also to upgrade the breaker for the outdoor condenser. The current fuse is a 30amp and the max fuse can go up to 45 double 208. It is possible that the fuse burned out due to the system needing a maintenance also the location of the outdoor condenser is under a deck and with hot temperatures this could drive up the amperage causing the fuse to blow out. System is in need of a maintenance the air handler is located downstairs in the growlers bar. An extension ladder is needed and also two technicians. The tenant needs to speak with the landlord so we can coordinate acces


Richard  .

Richard . Job Checkin

Today I arrived on site Initial Assessment: Determined the AC system was not working due to a full secondary drain pan. Problem Identification: Located the source of the issue: the EZ-Trap was clogged. Resolution: Cleared the clog in the EZ-Trap, resolving the drainage issue. Upon arriving at the property, the client explained to me that she noticed that the secondary drain pan was full of water. I proceeded to verify the tstat. The tstat had no power. I proceeded to check the AHU in the attic. I found the secondary drain pan full of water. I explained to the client that this water must be removed from the drain pan so that the pen switches return to normal and close the circuit. I presented him with the cost to remove the water from the drain pan. The client denied the proposal. The client said that she will remove the water herself. I ran water in the primary drain pan and checked for water leaks. The primary drain pan had no water leaks. I ran water into the condensate pum


julio@innovativeairsolutions.com

julio@innovativeairsolutions.com Job Checkin

Service call for issue with a/c that serves the main work out area of the gym. On arrival I spoke with Jackie and she had seen that the line set going out to the condenser was starting to freeze up so she had shut the system off. Air filter was very dirty this was replaced 20x20x1. System was turned on and all operations were checked. Found that the system is low on refrigerant causing it to freeze up. This is an indication that the system has a refrigerant leak. Explained to customer that there is a possibility of a leak and we would have to recharge the system up with refrigerant and add a dye to try and trace the leak. Once the dye is in the system we would have to return in 60-90 days to try and find where the system is leaking from. Unit could be leaking for either the indoor coil or outdoor coil or the line set. Jackie explained that I would have to email the owner to try and get approval. Nothing was done at this time and the system was left cooling off and fan on. https:/


Michael C.

Michael C. Job Checkin

HVAC tune up


Bryan S.

Bryan S. Job Checkin

Replacement of Burnham Oil Fired Steam Boiler.


Lorenzo M.

Lorenzo M. Job Checkin

A/C maintenance on Amana system and ductless mini split

A/C maintenance on Amana system and ductless mini split

John S.

John S. Job Checkin

Crawlspace Encapsulation, Aprilaire Dehumidifier, Spray Foam Rim Joist

Crawlspace Encapsulation, Aprilaire Dehumidifier, Spray Foam Rim Joist

John S.

John S. Job Checkin

Crawlspace Encapsulation, Aprilaire Dehumdifier, Spray Foam Rim Joist


Mark E.

Mark E. Job Checkin

Heating maintenance and diagnostics