Return to replace evap coil on space pak unit that serves the 2nd floor. All of the refrigerant was reclaimed from the system and the old coil was removed. Installed brand new evap coil pressure tested the system for leaks and pulled a vacuum. Recharged the system with 3lbs 8 oz of 410a. Monitored system and checked all operations. System is back up and running with a supply temperature of 45 degrees repair is completed. View visual findings from this job here - https://visionshare.xoi.io/?id=XA-FA02-B8AC17BA874345AEA4D7CB096D3853E5