11 Kimball Place
Mount Vernon, NY 10550
914-793-7700

Job Locations
for larchmont, ny


Map of Larchmont NY
Mark E.

Mark E.


Job Checkin

Preform maintenance on (1) Weil McLain high efficiency gas water boiler with (3) radiant heat zones and (3) Carrier hydro air handlers -(2) have zoning: WEIL MCLAIN HIGH EFFICIENCY BOILER: The boiler and most components are covered in cellulose insulation, dust and debris. Old and broken components for the system are scattered around the boiler room. - shut power to boiler - Open up cabinet doors - Found heavy debris / leaves / and corrosion inside the boiler - Vacuumed and dusted out boiler cabinet and components, boiler piping and components and boiler area - Removed flame sensor and igniter: cleaned with copper bristle brush and published with steel wool - Inspected inside of heat exchanger and found heavy corrosion - Remove the condensate trap of the bottom of the boiler, brushed and flushed clean and prime with freshwater - Perform full maintenance on condensate pump and reassemble - There is a neutralizer kit that is mounted to the floor of the boiler room, but is not connect