Upon arrival remove guess room indoor covers to expose coil and primary drain pan. Flush condensate pan and drain line with warm water. Saw water dripping from opposite end of condensate primary drain pan. After removing white Aesthetic cover at primary pan secondary discharge drain port. Found primary pan with hairline crack. Primary pan needs to be replaced. Temporary repair was made with epoxy spray until office could order and schedule repair trip for replacement of primary drain pan. Customer was advise to keep system off 24-48hours until epoxy adhesive could dry. Repair made isn’t guarantee to resolved issue, repair is made so it may be possible for customer to run AC until replacement of primary pan is completed. View visual findings from this job here - https://visionshare.xoi.io/?id=XA-FA02-ADD4EB2607A34050A839AF8B0AE22916