Prepped entire room with plastic and drop cloths and protected windowsill Set up machine and hoses Drilled two holes in each stud to fill with cellulose insulation Blew each hole with insulation leaving it densely packed Plugged each hole with 3” foam plug Patched each hole with netting and one coat compound Ran microfiber cloth and dry swiffer on wall to clean dust and debris Picked up drops and vacuumed entire floor