View visual findings from this job here - https://visionshare.xoi.io/?id=XA-90AE-319D7CA14C124756B410F4366ECDF0A9 Return to replace igniter on high efficiency Dunkirk boiler: at arrival check thermostat- satisfied at temp of 66 degrees stop call for heating and go down to boiler shut power to system and removed boiler cover door disconnected electrical from existing hot surface igniter removed hardware and hot surface igniter from boiler installed and secured brand new hot surface igniter in place with new hardware connect electrical to new hot surface igniter review all connections and return power to boiler call for heating at thermostat- boiler fires- normal operations cycle boiler on and off multiple times to insure normal operations confirm supply and return piping heating properly monitor operations for 20 minutes- okay repair is made- system is tested and operational