11 Kimball Place
Mount Vernon, NY 10550
914-793-7700

Job Locations
for yonkers, ny


Map of Yonkers NY
Mark E.

Mark E.


Job Checkin

View visual findings from this job here - https://visionshare.xoi.io/?id=XA-A243-17D2E9290797474BB86348A9D461356D Return to replace option panel control board on Burnham ES2 boiler : * power to boiler is OFF at system arrival * the boiler door is also OFF the system * disconnected and removed factory and field wiring from the bad option panel * removed the panel from the boiler cabinet * installed and secured new option panel in electrical cabinet * secure factory and field connections to brand new option panel * review all connections before returning power to boiler- power is back ON * the indirect tank is calling for DHW- the vent damper opens up, all limits close and no faults or errors, igniter sparks pilot, gas valve opens and boiler fires * supply and return piping for DHW heating properly * monitor operations and watch boiler cycle and satisfied at temp multiple times- normal operations * call for heating at (3) thermostat- heat is back up and running Repair is made system