Pride Plumbing came out and performed the following work: 1) turned the water off to the home; 2) cut an incoming waterline before a DAB booster pump going to a 40-gallon water tank; 3) inserted a new Amtrol-Worthington WP44SS well tank on the waterline before the booster pump and connected it to the booster pump using PEX piping and fittings, adding a ball water shutoff valve; 4) turned the water back on, filled the water tank, and tested for leaks and proper operation.