Pride Plumbing came out and provided a cost estimate to 1) cut an access hole in the bathroom wall and cut an existing vent pipe; 2) connect and run new PVC piping to the back of the house and through the wall to the outside; 3) run the PVC pipe up the side of the house 10-feet and cane the top of the pipe; 4) use strapping to secure the piping to the side of the house; and 5) install a plastic plumbing panel to cover the access hole we cut in the bathroom wall.