Pride Plumbing was called out for a broken Gerber three-handle bathtub/shower valve - one of the handles had stripped off. After cutting an access hole in the shower wall, we replaced it with a new Gerber three-handle model along with 1) replacing the valve's handles, shower head and downspout diverter); and 2) converting the valve's copper above-floor hot and cold water supply lines to PEX piping and stainless-steel fittings; tying them into the building's existing copper main water lines. Finally, we installed a plastic plumbing access panel over the hole we cut in the wall.