Pride Plumbing came out and performed the following work: 1) dug a ditch for a new sewer line from the house to a location in the yard; 2) installed new tracer wire, 4-inch PVC piping and fittings, and 2-way cleanouts in the new sewer line ditch; 3) dug a 9'x9' hole at the end of the ditch in the yard, installed a new E/One sewage pump system along with gravel as a base layer; 4) installed 1-yard of concrete around the pump's basin after its tank had been inspected and approved; 5) had an electrical contractor install the wiring for the new pump; 6) dug another ditch from the new E/One pump system to the town's sewer tap and hooked up to it; 7) tested the new pump and drain lines for working order; 8) backfilled the ditches and spread grass seed and straw after the work had been inspected and approved; and 9) trenched a ditch from an existing water meter to the home and replaced the black roll main outside water supply line with new PVC pressure piping and fittings along with installin