Pride Plumbing came out and provided a cost estimate to perform the following work: 1) remove two EBCO DF-14-PE water coolers; 2) cap off their drain and water supply lines; 3) check for leaks; and 4) after the water coolers are removed, install stainless-steel panels over the wall openings at each location.