Pride Plumbing came out and provided a cost estimate to perform the following work: 1) cut a concrete shower floor, dig down and uncover the shower's drain line, relocate it along with the shower's vent piping and PEX water supply lines, fill in the hole we dug out, and replace the concrete; 2) install a new Delta rough-in shower valve and shower arm; 3) install a new customer-supplied toilet along with a toilet tank water supply stop, stainless-steel braided water supply, toilet bolts, caps, and wax ring gasket; and 4) test for leaks and proper operation of all repairs.