Pride Plumbing came out and provided a price quote to install the plumbing for a garage remodel. This would include the following work: 1) once the customer removes the existing garage concrete flooring, we will dig a ditch from the house to the outside main sewer septic drain line and install a new 4-inch PVC sewer drain line with proper clean outs and fittings per code; 2) connect the new sewer line to the current main; 3) stub up the PEX hot and cold water supply and PVC drain lines for a bathtub/shower, double sink vanity, and a toilet; 4) once new concrete has been poured, install the fixtures and connect the water and drains for the new bathroom for the bathtub/shower, double sink vanity, and toilet.