Pride Plumbing came out to address a clogged ice maker drain. We cut out the concrete floor around the drain to access its 3-inch PVC P-trap and found it full of grout. We cut out and replaced the P-trap, backfilled it with dirt, reset the floor drain and poured concrete back to a half inch below the finished floor level.