Pride Plumbing came out, dug down to and uncovered the outside main sewer septic drain line, cut into it, and installed a new two-way PVC cleanout with a cap (connecting it to the existing outside main sewer septic drain line with new PVC fittings and two Fernco couplings). We also busted the concrete around a floor drain, dug down and raised it to the appropriate building code level, and backfilled the area we dug out with dirt.