203 North Main Street
Mount Gilead, NC 27306
910-439-9598

Job Locations
for lilesville, nc


Map of Lilesville NC
Becky L.

Becky L.


Job Checkin

Pride Plumbing came out and repiped and replaced the drain lines under the house in the crawlspace, going to a) the fixtures in the kitchen (sink and dishwasher) and two bathrooms (sinks, toilets, and bathtubs/showers - replacing the toilet bowl flanges and wax ring gaskets, the bathtub/shower drains, and the P-traps underneath all the sinks, and the bathtub/shower's waste and overflow); and b) the washing machine - installing new PVC piping, fittings and supports under the house and up through the flooring for each fixture and air admittance valves inside the home where needed. We also dug down to the outside main sewer septic drain line outside at the foundation, cut into it, installed a new two-way PVC cleanout, and covered the hole we dug out.

Pride Plumbing came out and repiped and replaced the drain lines under the house in the crawlspace, going to a) the fixtures in the kitchen (sink and dishwasher) and two bathrooms (sinks, toilets, and bathtubs/showers - replacing the toilet bowl flanges and wax ring gaskets, the bathtub/shower drains, and the P-traps underneath all the sinks, and the bathtub/shower's waste and overflow); and b) the washing machine - installing new PVC piping, fittings and supports under the house and up through the flooring for each fixture and air admittance valves inside the home where needed. We also dug down to the outside main sewer septic drain line outside at the foundation, cut into it, installed a new two-way PVC cleanout, and covered the hole we dug out. Pride Plumbing came out and repiped and replaced the drain lines under the house in the crawlspace, going to a) the fixtures in the kitchen (sink and dishwasher) and two bathrooms (sinks, toilets, and bathtubs/showers - replacing the toilet bowl flanges and wax ring gaskets, the bathtub/shower drains, and the P-traps underneath all the sinks, and the bathtub/shower's waste and overflow); and b) the washing machine - installing new PVC piping, fittings and supports under the house and up through the flooring for each fixture and air admittance valves inside the home where needed. We also dug down to the outside main sewer septic drain line outside at the foundation, cut into it, installed a new two-way PVC cleanout, and covered the hole we dug out.