Pride Plumbing responded to a sewage backup in the building. After inspecting, we found the septic tank full. We called in our septic pumping truck, uncovered the septic tank, removed its lid, pumped it out, and cleaned the tank’s filter. Before resetting the lid and covering the tank back up, we cleared a blockage in the outside main sewer septic drain line going to the septic tank and then ensured proper drainage by flushing the toilets and running water down multiple drains for several minutes.