Pride Plumbing came out and provided a cost estimate to perform the following work: 1) cut a 2-foot wide concrete walkway and remove 4 sidewalk pavers; 2) dig down and expose the sewer line from an outside cleanout to a 90-degree elbow; 3) cut the drain line next to the cleanout all the way back to a 90-degree elbow at the end of the pavers; 4) replace the piping with new PVC piping and fittings along with a wye in the doorway for a washing machine and the 90-degree elbow; 5) test the new piping for leaks and proper drainage; 6) put the sand back in the hole we dug out and compact it; 7) mix concrete and repair the walkway; and 8) put the pavers back in place and clean up all work debris.