Pride Plumbing came out and provided a cost estimate to perform the following work: 1) cut and cap an existing sewer line going from the house to an existing septic tank; 2) reroute the home's existing drain plumbing outside to the side of the house; 3) dig a new ditch for a new sewer line from the house to a location in the yard; 4) install new tracer wire, 4-inch PVC piping and fittings, and 2-way cleanouts in the new sewer line ditch; 5) dig a 9'x9' hole at the end of the ditch in the yard, install a new E/One sewage pump system along with gravel as a base layer; 6) install 1-yard of concrete around the pump's basin after its tank has been inspected and approved; 7) leave the ditch open for an electrical contractor to install the wiring for the new pump; 8) dig another ditch from the new E/One pump system to the town's sewer tap and hook up to the town sewer tap using pressure pipe and fittings; 9) test the new pump and drain lines for working order; 10) backfill the ditches after t