Pride Plumbing came out and provided cost estimates to 1) trench a ditch from the water meter to the building and replace the black roll main outside water supply line with new PEX piping and fittings along with installing a new pressure reducing valve (PRV) and ball water shutoff valve at the water meter; 2) trench a ditch from the water meter to the building to expose and replace the outside main water supply line with new black roll and PEX piping and fittings along with installing a new pressure reducing valve (PRV), ball valve, and check valve at the water meter in the meter box; 3) install two new ADA toilets; 4) install a point-of-use water heater underneath a bathroom sink; and 5) install a bi-level water cooler drinking fountain.