Pride Plumbing came out and: 1) installed a new 1-inch black roll and PEX outside main water supply line from the water meter to the house along with installing tracer wire in a ditch that had already been dug by the customer; 2) connected the new water line to an existing water line connection under the house and installed a ball valve main water cut off in the crawlspace; 3) installed a new pressure reducing valve (PRV), ball water shutoff valve, and check valve at the water meter in the meter box; 4) tested the new water line for leaks and working order; and 5) backfilled and tamped the ditch after the work was completed and approved by Moore County’s Inspection Department.