View visual findings from this job here - https://visionshare.xoi.io/?id=XA-213F-7AAF29F22FD0455DB1622FD8C9E2AF72 Perform maintenance on well McLean gas fired water boiler with two heating zones- Forced air Hydro air handlers: Also, there is a drip from the boiler please review * shut Power to the boiler at arrival * Removed boiler cover and shut pilot off at gas valve * Removed all burner tubes, flame, guard, and rollout switch * Remove thermocouple from the pilot assembly and gas valve * Perform full maintenance on pilot assembly cleaning completely plugged gas orifice * Customer approved replacement of thermocouple- Installed brand new thermocouple in pilot assembly * Brushed out and vacuumed all burner tubes, clean and clear * Vacuum and dusted boiler cabinet and components clean and clear * Vacuum and dusted all piping and components, clean and clear * Inspected heat, exchanger and flu piping * Reinstalled all burners, pilot assembly and Secured all connections back to gas v