View visual findings from this job here - https://visionshare.xoi.io/?id=XA-A243-20534C4686284053959D5EACF614F8DE Return to replace gas train on Burnham alpine boiler: at arrival, I opened the boiler up and shut power down to the system I proceeded to start disconnecting the electrical from the existing components that are being replaced I opened up the boxes of the new components to find that they were not the correct parts I reconnected all electrical connections back to the existing components and return power back to the system I tested operations to confirm that the boiler fire is up and is working properly Reached out to the office and sent information on the boiler for office to follow up with correct parts