11 Kimball Place
Mount Vernon, NY 10550
914-793-7700

Job Locations
for village of pelham, ny


Map of Village of Pelham NY
Mark E.

Mark E.


Job Checkin

View visual findings from this job here - https://visionshare.xoi.io/?id=XA-A243-A9BD187E32824197AC95D554422BB4FB Return to replace ignition control board on Weil McLean gas fired water boiler: * At arrival I found the boiler Jerry rigged To give the customer temporary heating until this control board was replaced * Remove the duct, tape and zip tie holding the damper Molex connector in place * Shut power to the boiler * Disconnected electrical wiring from the existing boiler control * Remove the boiler control from the boiler cabinet- Inspected the boiler control and found that the pins are loose connecting to the control board for the vent damper * Installed and secured a brand new ignition control board into the boiler cabinet * Wire in and secure all high and low low-voltage electrical connections to the system * Set the temperature of the boiler to 180° * Review all connections before restoring power to the boiler- Power is back on * Return the switch on the vent damper back to