This estimate includes: - Removing existing service entry cable for both services - Installing (2) new disconnects after each load side of meter sockets - Relocating (1) 200 Amp panel to “unit B” - Installing (2) new feeder cables to both 200 Amp main breaker panels - Grounding both services as per NEC standards - Permits and inspection of service