Service cable is damaged and needed to be replaced. Due to needing a permit and code violations in panel the entire service needed to be replaced. Installed a emergency disconnect outside along with 2 ground rods. Installed a new panel with all new breakers and a whole home surge protector. Office will call to schedule inspection followed by final tie in by BGE.