Pride Plumbing came out and performed the following work: 1) removed the front panel from a water drinking fountain and adjusted the amount of water flow going to the drinking fountain's head; 2) cut and removed a section of a concrete floor to gain access to a drain line underneath, capped the drain line below the floor and the vent pipe above the ceiling, and cut and capped a cold water supply line overhead for a sink; 3) removed two existing toilets, stored them on the job site to be reinstalled later, and chipped around each toilets' flange to prepare them for new tile flooring to be installed; and 4) removed and replaced the floor drains and cleanouts in two bathrooms.