520 Trestle Place
Downingtown, PA 19335
(610) 873-1244

Job Locations
for haverford, pa


Map of Haverford PA
Barry P.

Barry P.


Job Checkin

System had 0 degree temperature split when I arrived. Charged unit using superheat method 5#. Final superheat 16.8 indoor wet bulb 62 outdoor dry bulb 70. 17F temperature split. Had conversation with Mrs. Worth about the value of setting up a comfort consultation appt to discuss replacement options. She is using a window unit to cool b2nd floor. System is operating well at the time of this tune up.