Pressure package Removed defective parts from hot water boiler and installed new parts Parts are as follows expansion tank, water, air vent Relief valve and watts Automatic water feeder refilled system with water, tested for leaks and purged air out of system no leaks detected Turn system on and checked operations and check gas lines and checked for carbon monoxide natural gas or carbon monoxide detected left system working View visual findings from this job here - https://visionshare.xoi.io/?id=XA-DE27-AB4C93104569425BBBB7CA03206F1700 landlord Mrs Sue was not at the location called her and informed her that the job is completed and functional with her approval I charged the card on file