West system. One pump non pressurized flow center, New hose kits, set alcohol antifreeze to +15° freeze protection final specific gravity 0.973 East Geothermal Install the correct geothermal swivel fittings with t&p test ports 45 minute micron flush requiring three filter cleanings Set final (out) pressure at 35 PSI with flushing cart Total 3.5 gallons methanol antifreeze used between two systems Both systems are functioning very good and are returned to normal operation Water on the floor in the pictures in the vicinity of the new flow center is groundwater leaking through the foundation penetration holes. Recommend contacting foundation or basement company for permanent repairs to stop the water Homeowners will complete the invoice via online Link