Seth has completed our semi-annual check up for several years. He does a great job and I appreciate his help.
Gas heating preventative maintenance performed BASEMENT Check filter - 20x25x4 new today shop stock Clean flame sensor Ohm test igniter: 57.2 Inspect wiring for loose connections and/or hot spots - Check humidifier pad: ok - turn hum on 40% Inspect exhaust flu - 2” pvc no concerns Set thermostat for heat Check amp draw on blower motor: 0.63 Check amp draw on inducer motor:3.24 Check delta T - 59° Furnace is in optimal running conditions Gas heating preventative maintenance performed 2ND FLOOR Check filter - 20x25x4 new today shop stock Clean flame sensor Ohm test igniter: 53.4 Inspect wiring for loose connections and/or hot spots - Check humidifier pad: n/a Inspect exhaust flu - 2” PVC no concerns Set thermostat for heat Check amp draw on blower motor: .36 Check amp draw on inducer motor:1.92 Check delta T - 54° Furnace is in optimal running conditions Gas heating preventative maintenance performed GYM Check filter - 20x25x4 new today Clean flame sensor Ohm test igniter: 49.7
Tyler wants to join the maintenance plan - gold 6 system 1 dessert aire 1 daikin ductless and 4 carrier furnace/ac units. 1 E130 dehum and 2 600 humidifiers.
Commission all four carrier furnaces. Commission Daikin and Desert Aire unit. Set all gas pressures at 3.30 inwc. High stage, and 1.5 inwc. low stage. Breaker is off for Desert Aire unit but it is ready to run. It is set to factory recommendation for pool efficiency. 85⁰ setpoint with 55% humidity demand. All system filters are already becoming dirty due to construction dust. X4 20x25x4 & X4 16x20x4 glass floss specific filters. Remove and replace Main house inducer motor assembly under manufacturers parts warranty. Clamp Desert Aire lineset to stone wall. And add missing 4x10 floor register.
Carrier Furnace Installed in a New Construction house.
Aprilaire Humidifier Installed in a New Construction house.
Carrier Furnace Installed in a New Construction house.
HVAC system install with April Aire humidifier for new construction home.
Full 2 system Hvac Install for Corinthian Homes new construction
Staged material for new construction complete HVAC install
Daikin Fit installation in a Corinthian new construction Custom Home.
Install relay on Waterfurnace 5 Series split unit paired with Tempstar furnace for proper back-up heat operation in London, OH.
Waterfurnace 5 series geothermal installation in the Molly Caren Department of Agriculture building for The Ohio State University.