View visual findings from this job here - https://visionshare.xoi.io/?id=XA-EE1C-18B1962A32B74ACEB504720989B368A4 Preform maintenance on (1) Weil McLain gas water boiler with DHW, radiant heat, and (2) hydro air handlers: Attic Air handler and condenser replaced by another company with Bosch heat pump GAS WATER BOILER : * shut power to boiler * removed boiler cover door * removed all burner tubes, flame guard and roll out and shut pilot down at gas valve * vacuumed and brushed all burner tubes clean and clear * vacuumed and dusted burner section, boiler cabinet, piping and components clean and clear * vacuumed boiler area clean and clear * replaced thermocouple provided by customer explaining that there is no warranty as part is provided by him * preform full maintenance on pilot assembly and gas orifice * reassembled and installed pilot assembly with new thermocouple securing back to gas valve and check for leaks * install all burners, flame guard and roll out back in place * ins