Today I arrived on site: AC System - Starter Cap Replacement:Identified malfunctioning starter cap on the 1st floor foyer AC system. Replaced the 45/10 uf starter cap. Upon arrival at the property. I explained to the client the reason for the visit. The client was waiting for us to make the relationship. I proceeded to verify the condenser unit of the 1sr floor foyer. I proceeded to disassemble the starter cap malfunctioning. I proceeded to install the new starter cap. I concluded with the installation of the new starter cap. I started system and monitoring for a few minutes. I checked the system pressures. Stable pressures on this occasion. 125psi suction pressure. The client was left with the system operating correctly at this time. View visual findings from this job here - https://visionshare.xoi.io/?id=XA-57DC-FA0C8BBF77E341EBBF724AE107EE779C