5-19-25 Cleaned and measured sewer line downstream to city main from outside cleanout in preparation for sewer lining. 5-22-25 Inserted a 6” liner through the existing outside clean-out extending approximately 55’ downstream to just before the city main, located on the opposite side of the street.