Pumped down heatpump. Recovered refrigerant left in lineset and evaporator. Removed old amana evaporator. Installed new Bosch evaporator. Reconnected lineset and condensate drain. Reconnected and sealed supply plenums. Pressure tested system with nitrogen. Pulled vacuum on system. Tested operation of system in cooling. System running upon completion.