View visual findings from this job here - https://visionshare.xoi.io/?id=XA-A243-5EA3CC6D994244638A5A7230F9745017 Return to replace gas train assembly on Burnham K2 high-efficiency boiler: At arrival, the boiler is shut down Open the boiler cabinet to access components Found that the Blower motor electrical was hooked back up, and the system was not in the way I left it The customer had other companies come out to the boiler to see if they could fix it, but we’re unsuccessful Start disconnecting existing gas train assembly from Burnham K2 boiler When unboxing the new components - They do not match up Confirm that the parts that were provided by the manufacturer/ Distributor are not correct Unable to Make repair at this time- Incorrect components While on site reached out to Distributor and provided them with data plate info from the existing gas train that is in the boiler and what they sent me. As well as the data plate info off of the boiler- They are currently researching the par