Task Inlcudes -Removal of existing metal duct work for both 3 ton systems -New supply and return plenums for both 3 ton systems -All new supply air ducting (17) -(4) New return boot box and diffuser cut ins -(6) New supply boot box and diffuser cut ins -Strapping and sealing to codes
Walked job and provided lay out of (2) new 3 ton duct systems Awaiting for Joe approval before sending
Gave client estimate to replace AC system. Client getting multiple estimates and will get back to us by tomorrow.
Brennan G Today I visited and replaced the blower motor for system #2 And preformed the 1st of 2 maintenance visits on both systems. The equipment is operating normally at this time. I replaced filters and verified the condenser coils are clean.
Brennan G Today I visited and replaced the blower motor for system #2 And preformed the 1st of 2 maintenance visits on both systems. The equipment is operating normally at this time. I replaced filters and verified the condenser coils are clean.
Brennan G Today I visited for the right side system not heating. I discovered a faulty blower motor. We will return tomorrow to replace the motor and preform maintenance.
Brennan G Today I visited for system maintenances. All systems except 4 and 5 are operating normally at this time. I replaced all of the air filters throughout the home. Verified electrical components and refrigerant levels are within range. I discovered system #3 had a weak capacitor. We recommend it is replaced. I discovered system #4 is low on refrigerant and will need further repairs. Due to the age repairs are not recommended. I discovered system #5 has a weak capacitor and the air handler is contaminated with biological growth. Due to age repairs are not recommended. Helen plans to have us return in the spring to replace capacitor #3 and provide estimates for the replacement of systems #4 and #5. We also discussed the replacement of system #4s ducts as they are easily accessed and in poor condition. We discussed the duct sanitation of the downstairs duct system as for they are not accessible. We replaced the thermostat for system #5 today.
Brennan G Today I visited to document the locations/data of all 5 systems in the home. System# 1 - 2023 daikin - kitchen area System#2 - 2023 daikin- great room System#3 - 2017 trane- master area System#4- 2015 icp - upstairs right side System#5- 2014 icp- downstairs right side We enrolled all 5 Systems into our maintenance agreement for 1 year. I will be returning next week to preform the 1st maintenance and inspections of all 5 systems.
Task includes -Tearing Sheetrock down in areas where duct system is located -Demoing all existing duct board duct system -Prefabricating All new duct board duct system on site -Sealing to code replacements
Gave quote for new fiberglass duct board duct system in condo home. Awaiting for further approval.
Made client aware that unit is undersized and need to be upsized to a 5 ton and relocated to garage and suspended. Client is on board with situation but needs husband to make final decision awaiting to hear back from clients
Changed out control boards under warranty! System operating nominal now!
Warranty repair estimate