Task Includes -Replacement of in warranty evaporator coil -Replacement of bi flow filter dryer -Pressure testing with nitrogen for further leaks -Pulling Required vacuum on system -Charging system by the LB with R-410A to Trane manufacturing specs *** please note Freon is by the lb and is subject to change***