5-23-25 Cleaned and measured sewer line in preparation for sewer lining. 6-11-25 Inserted a 6” liner through the existing inside clean-out extending approximately 69 feet downstream to just before the city main. Reinstated the neighbors 6” pvc connection at approximately 30ft downstream of the clean out.