Excavated area in garage to expose 4” cast pipe that was shifted. Repiped with 4” pvc. Descaled 4” cast iron pipe and got measurements for lining. Inserted a 4-6” liner through the open pipe extending approximately 80 feet downstream ending just before the city main and starting in the 4” cast iron. 8/8/24 Inspection & backfill on different job.