Performed sewer preparation by cleaning and measuring the pipe. On 7-5-24, inserted a Perma-Linerâ„¢ resin-saturated liner through the existing exterior cleanout. The liner extended approximately 80 feet, stopping just before the city main. Used an inversion drum for liner insertion and cured it in place with steam, creating a seamless and durable internal pipe repair.