Performed quoted work on second floor system: Replaced faulty condensate safety switches New float switch attached to the secondary drain connection on the evaporator coil drain pan New wet switch inside the furnace cabinet Performed Gold level cooling maintenance: Replaced 20x25x4 and 16x25x4 filters Blowers are clean Drains are clear Both systems producing 20⁰ temperature drop Tore down and washed both outdoor units Refrigerant charge correct for both units Capacitors in spec Amp draws in spec Systems are clean and operating within manufacturer's specifications at this time